Prisma - Major Upgrade
Scheduled Maintenance Report for CubedHost, LLC
Completed
Due to a number of technical issues that have come up with our production infrastructure, namely the logistics behind replacing an entire billing system, the upgrades and migration have not yet taken place. Some changes have taken place to the infrastructure behind the scenes, but it will not be possible to migrate this morning.

We'll be rescheduling this for midnight CDT tomorrow; roughly 16 hours from this posting.
Posted May 06, 2021 - 14:01 UTC
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted May 06, 2021 - 14:00 UTC
Scheduled
Due to a number of technical issues that have come up with our production infrastructure, namely the logistics behind replacing an entire billing system, the upgrades and migration have not yet taken place. Some changes have taken place to the infrastructure behind the scenes, but it will not be possible to migrate this morning.

We'll be rescheduling this for midnight CDT tomorrow; roughly 16 hours from this posting.
Posted May 06, 2021 - 14:00 UTC
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted May 06, 2021 - 11:01 UTC
Scheduled
We'll be performing updates to the Prisma control panel and daemon software on Thursday, May 6th at 11AM UTC / 6AM CDT. During this maintenance window, it's possible that management of your Minecraft server(s) may not be possible for a short duration due to major software changes.

Services will remain online without interruption, however, scheduled tasks may not run for a short period of time while the daemon reboots and comes back online.
Posted May 05, 2021 - 17:28 UTC
This scheduled maintenance affected: Prisma - Game Hosting Platform (Ashburn, VA, USA, Dallas, TX, USA, Chicago, IL, USA, Miami, FL, USA, Los Angeles, CA, USA, Phoenix, AZ, USA, Seattle, WA, USA, Montreal, QC, Canada, Amsterdam, NL, Frankfurt, DE, London, UK, Roubaix, FR, Warsaw, PL, Singapore, SG, Sydney, AU) and Prisma Control Panel (POP - Ashburn, VA, POP - Dublin, Ireland, POP - Sydney, Australia).